Skip to content
Manufacturing

Find shortages days early, not on the shop floor.

Gudz explodes your bills of materials against open orders and stock, tells you what to buy and by when, and holds material for every production order. Batches, by-products, yield and cost per unit are recorded as you make them.

Production
This week
Open orders
18
6 due this week
Material ready
14 of 18
Shortages
3
Across 2 orders
Yield, 30 days
96.4%
Target 95%
OrderStatus
PRD-0418Granola bar 40 g, almond honeyShortage
PRD-0417Muesli 750 g, fruit and nutIn progress
PRD-0416Peanut butter 340 g, crunchyIn QC
PRD-0420Oat cookies 150 g, jaggeryShortage
PRD-0421Trail mix 200 g, saltedReleased
MRP drafted 3 POs at 6:00 amReview POs

From demand to finished stock

Plan once and each step creates the paperwork for the next. Your planners make the decisions; Gudz does the arithmetic.

  1. 1

    Demand comes in

    Sales orders, forecasts and reorder levels become a list of what to make.

  2. 2

    MRP runs

    BOMs are exploded level by level against stock, reservations and open POs.

  3. 3

    Shortages bought

    Draft purchase orders go to the usual vendor for each material, for approval.

  4. 4

    Order released

    Material is reserved and issued to the floor along the routing.

  5. 5

    Output recorded

    Good quantity, batches, by-products and QC results are logged per run.

  6. 6

    Stock and cost posted

    Finished goods enter stock at their actual cost, ready to sell.

Inside Manufacturing

Bills of materials as deep as your product.

Model finished goods, sub-assemblies, intermediates and packaging on as many levels as you need. Explode the tree for any quantity and see what each level needs, what's in stock and what's still on order.

  • Multi-level BOMs with made and bought items
  • Expected scrap set per component
  • Routings with steps, work centres and standard times
Granola bar, box of 12
3 levels
Explode for833 boxes
MadeBought
ComponentQty
Granola bar, box of 12833
Granola bar 40 g10,000
Granola mix420 kg
Rolled oats240 kg
Honey100 kg
Almonds, sliced80 kg
Wrapper film10,200
Carton, 12-bar840
Routing for granola bar 40 g3 h 15 min per batch
  1. Mix30 minMixer M1
  2. Bake45 minOven 2
  3. Cool60 minTunnel
  4. Cut20 minSlitter
  5. Wrap40 minFlow wrapper

See next week's shortages this week.

MRP looks at every open production order, its BOM, your stock and what vendors are due to deliver. When a material will run short, it tells you by how much, on which day and which order it holds up.

  • Projected stock for every material, day by day
  • Open POs and job work counted as supply
  • Draft POs for each shortage, ready to approve
Projected stock
3 shortages
HoneyJaggery powder
On hand 140 kgSafety stock 30 kg
Safety0 kg
 −60−100+120−40  
MonTueWedThuFriSatSun
Short 20 kg on Wed 15 for PRD-0418
PO-2207 from Nectar Farms lands Thu 16, a day late.
40 kg, Himalayan ApiariesBy Tue 14, ₹18,800Draft PO

Production orders that record what really happened.

As the floor reports output, Gudz logs the batch, the by-products, the QC result and the actual yield. The cost of what went in, from the latest receipts, rolls into the finished goods.

  • Batch, lot and serial numbers with printed labels
  • By-products and yield recorded for every run
  • Cost per unit that updates with each receipt
Output
Running
Muesli 750 g, fruit and nut
2,352 of 2,400 packs
B-1017-A1,184 packs QC
B-1017-B1,168 packsIn QC
By-productOat fines, 14 kg
Muesli 750 gB-1017-A
Mfd 14 Oct 26Best before 13 Apr 27
Printed on TSC, 50 × 30 mm
Muesli 750 g
₹142.60+2.6%
Standard ₹139.00
  • Material₹104.20
  • Packaging₹14.80
  • Labour and overhead₹16.40
  • Job work, roasting₹7.20
Almonds came in at ₹912/kg on GRN-3391, up from ₹860. Material cost updated.
98%
Yield
Target 97%, 48 packs short

Everything in Manufacturing

The pieces your team uses every day, all reading from the same record.

  • Multi-level BOMs

    Sub-assemblies, intermediates and packaging, exploded for any quantity you plan.

  • Routings

    The steps each product goes through, with work centres and standard times.

  • Material planning

    MRP that dates every shortage and counts supply already on its way.

  • Production orders

    Release, reserve, issue, record output and close, with every movement in stock.

  • Batch and serial tracking

    Lot and serial numbers on every output, with labels printed from the order.

  • By-products and yield

    Planned against actual output per run, with by-products going back into stock.

  • Quality checks

    QC on output with pass, hold and reject before stock can be sold.

  • Costing

    Cost per unit from actual material, labour, overhead and job work.

  • Subcontracting

    Send material to a job worker, track it there and receive the goods back.

Gudz AI in Manufacturing

Ask what you can make, and get the PO drafted.

Hyperion reads your BOMs, stock and open orders, answers in plain words and drafts purchase orders for your approval. Workflows can alert a buyer the moment MRP finds a gap.

Hyperion

Can we make 10,000 granola bars by Saturday?

getBillOfMaterialsgetInventoryLevelslistPurchaseOrders
Almost. Oats, almonds, film and cartons are covered. Honey runs 20 kg short on Wednesday, and the next PO only lands on Thursday. Himalayan Apiaries can deliver 40 kg by Tuesday at ₹470 a kilo.
Draft a PO for 40 kg of honeyReview

Works with

Manufacturing shares one record with every other module, so nothing needs syncing.

Connects to

  • Tally
  • GST e-invoice
  • E-way bills
  • Zoho
  • TSC label printers
  • Android handhelds
  • WhatsApp
  • Email

Questions about Manufacturing

Does Gudz handle both process and discrete manufacturing?

Yes. Process plants work with batches, yields and by-products; discrete plants with serial numbers and assemblies. Both use the same BOMs, routings and production orders. If you run multi-station assembly lines, the Factory module adds lines, stations and scheduling on top.

How does MRP decide what to buy?

It explodes the BOM for every open production order, subtracts stock already on hand or reserved, adds open purchase orders and job work due back, and dates any gap. Each shortage shows the order it affects and a suggested purchase order.

Can we see which raw material batches went into a finished batch?

Yes. Every production order records the batches it consumed and the batch or serial numbers it produced, so you can trace forward to the customers who received it or back to the vendor who supplied it.

How is the cost of a finished product worked out?

From the material actually issued, at the cost it was received at, plus the labour, overhead and job work charges set on the routing. When a new receipt changes a material's cost, the next run picks it up.

Bring one of your BOMs to the demo.